中文   ENGLISH 

News



Service



Contact

Home > News >

Delingha 50MW Photothermal Demonstration Project Put into Operation
Time:2019-04-04   Clicks: 1040
    In October last year, it was learned from the Shenzhen Headquarters of China General Nuclear Power Group (CGNPC) that China’s first large-scale commercial thermal and thermal demonstration power station, CGNPC Delingha 50MW Photothermal Demonstration Project, was officially put into operation, and China became the 8th in the world. A country that has mastered large-scale light and heat skills.

Li Yilun, general manager of China Nuclear Power New Energy Holding Co., Ltd., indicated that this is the first of the first 20 solar thermal demonstration projects approved by the National Energy Administration of China, and it has only been put into operation on the grid. The industry's first power station to receive low-interest loans from the Asian Development Bank.

Solar Controller

It is reported that the China-Guangzhou Nuclear Delingha Light Thermal Demonstration Project is located on the Gobi Desert in Delingha City, Haixi Mongolian Tibetan Autonomous Prefecture, Qinghai Province. It covers an area of 2.46 square kilometers, equivalent to the area of more than 360 standard football fields, and adopts trough heat transfer oil. The heat collecting skill road is equipped with 9 hours of molten salt heat storage, which consists of four parts: Sun Island, heat transfer and steam attack system, heat storage island and power generation island.

It is understood that the Sun Island collector of the Delingha project consists of 250,000 pieces of mirrors with a total area of 620,000 square meters, a vacuum collector tube of 110,000 meters long, and a tail-drive device. It can trace the sun and heat sources. Collect it continuously.

The molten salt storage tank standing on the heat storage island, with a diameter of 42 meters, is the largest molten salt storage tank in Asia. The Delingha project uses slot heat transfer oil solar thermal power generation technology, equipped with a low-cost, large-capacity, pollution-free energy storage system. When the light is lacking, the stored heat can continue to generate electricity, achieving 24-hour continuous stability. Power generation has greatly improved the stability of the regional power grid.

According to Wang Zhigang, general manager of CGN New Energy Delingha, the annual power generation of the Delingha project can reach nearly 200 million kWh. Compared with the same size thermal power plant, it can save 60,000 tons of standard coal per year and reduce carbon dioxide and other gas emissions. 100,000 tons, equivalent to 4,200 acres of afforestation.

Solar Controller


We are a national key high-tech enterprise integrating R&D, production, sales and service, specializing in the production of MPPT controllers, inverters, UPS, solar energy, wind energy and other energy power products. The main products include industrial grade MPPT solar controllers, solar inverters, solar power systems, UPS and other energy products. It is a leading manufacturer of MPPT controllers in China.

Disclaimer: The content is partly from the internet. In order to pass on more information, it does not mean agreeing to its views or confirming its description. Article content is for reference only. If there is any infringement, please contact in time.


Prev:The first large-scale photovoltaic power generation project in Macedonia
Next:Korea International Green Energy Exhibition held
版权所有 Copyright © 2019深圳爱庞德新能源科技有限公司 | 粤ICP备16086612号 技术支持:杉夏科技  网站地图