中文   ENGLISH 

News



Service



Contact

Home > News >

Chongqing actively guides the construction of new large-scale public buildings to apply renewable energy
Time:2019-04-24   Clicks: 1120
    Recently, the city's residential and urban construction committee learned that as of now, Chongqing's renewable power construction and use area has broken 15 million square meters, can reduce carbon dioxide emissions by 560,000 tons per year, save 210,000 tons of standard coal, and save construction and operation costs of 300 million yuan. Photovoltaic building

Renewable power refers to the power that can be continuously used and recycled in nature, such as solar energy, wind energy, water energy, biomass energy, ocean energy, tidal energy, and geothermal energy. Renewable power technologies used in Chongqing include water source heat pumps, ground source heat pumps, air source heat pumps, and solar energy. Chongqing has a unique resource endowment for renewable power.

The total amount of water resources in Chongqing is more than 500 billion cubic meters per year. The vast majority are surface waters dominated by rivers. During the period, the surface waters of the Yangtze River and Jialing River that flow through the Chongqing area are about 460 billion cubic meters. The main stream traverses the whole territory from west to east, with a flow of 665 kilometers.

According to the city's residential and urban construction committee, Chongqing has been implementing renewable power construction since 2008, actively guiding the construction of new large-scale public construction and use of renewable power, and promoting the annual use of more than 1 million square meters. Up to now, Chongqing has accumulatively vying for a total of 190 million yuan in the center. First, the “National Renewable Power Construction and Demonstration City” and the “Three-level Demonstration” of the Wuxi, Yunyang and Mudong National Renewable Power Conferences will be completed. Mission, and smooth national inspection.

In 2018, the city's first “heat-heating and warm-up” project – the reclaimed power construction and use of the water and soil area of Liangjiang New District will be connected to the demonstration area. The largest “water-conditioning” project in the country – Jiangbeicheng CBD area river water source heat pump gathering The cold supply and heating project has been tested by experts. Photovoltaic building

This year, 3.2 million square meters of Yuelai Ecological City and 1.2 million square meters of Xiantao Data Valley will be built for the supply of cold and heat. At the same time, the Municipal Housing and Urban-Rural Construction Committee will also guide the preparatory areas of the Suizhong Peninsula, the Kowloon Peninsula, and the Guangyang Island to develop large-scale use of renewable power regions, and continue to cultivate new energy-saving energy-saving and emission reduction measures in Chongqing. For more content, please pay attention to the solar industry information magazine official micro-acquisition.

We are a national key high-tech enterprise integrating R&D, production, sales and service, specializing in the production of MPPT controllers, inverters, UPS, solar energy, wind energy and other energy power products. The main products include industrial grade MPPT solar controllers, solar inverters, solar power systems, UPS and other energy products. It is a leading manufacturer of MPPT controllers in China.

Disclaimer: The content is partly from the internet. In order to pass on more information, it does not mean agreeing to its views or confirming its description. Article content is for reference only. If there is any infringement, please contact in time.


Prev:Technology giants are deploying renewable energy
Next:South America's largest photovoltaic power plant is rising
版权所有 Copyright © 2019深圳爱庞德新能源科技有限公司 | 粤ICP备16086612号 技术支持:杉夏科技  网站地图